環(huán)境影響報(bào)告書草案-報(bào)告第2部分DRAFT ENVIRONMENTAL IMPACT STATEMENT -report part2
- 資料類別:
- 資料大?。?/li>
- 資料編號(hào):
- 資料狀態(tài):
- 更新時(shí)間:2021-09-20
- 下載次數(shù):次
資料簡(jiǎn)介
URS小組(URS)在2012年1月至5月期間為擬建的NRG Energy, Inc. (NRG) W.A.堂區(qū)燃燒后二氧化碳捕獲和封存項(xiàng)目進(jìn)行了一期考古調(diào)查。該管道將位于福特本德,沃頓和杰克遜縣,得克薩斯州,以運(yùn)輸捕獲的二氧化碳從W.A牧場(chǎng)油田的教區(qū)工廠。大約100%的主要管道勘測(cè)走廊進(jìn)行了文化資源評(píng)估;現(xiàn)時(shí)需要額外的土地許可,以勘測(cè)一條擬議的通道和三個(gè)額外的臨時(shí)工作空間。作為這項(xiàng)調(diào)查的結(jié)果,對(duì)101.0英里(162.5公里)的優(yōu)先和廢棄管道走廊、75條長(zhǎng)度為49.7英里(80.0公里)的通道和47個(gè)額外的臨時(shí)工作場(chǎng)所進(jìn)行了評(píng)估,總面積為88.7英畝(35.9公頃)。作為調(diào)查的一部分,他們挖掘了1625個(gè)鐵鏟試驗(yàn),確定了6個(gè)考古遺址和12個(gè)歷史遺跡,分析了1935件文物。
URS Group (URS) performed a Phase I archaeological survey between January and May of 2012 for the approximately 80-mile-long (130 km) pipeline corridor for the proposed NRG Energy, Inc. (NRG) W.A. Parish Post-Combustion CO2 Capture and Sequestration Project. The pipeline would be located in Fort Bend, Wharton, and Jackson Counties, Texas to transport captured CO2 from the W.A Parish Plant to the West Ranch oil field. Approximately 100 percent of the primary pipeline survey corridor was assessed for cultural resources; additional land permission is currently required to survey a single proposed access road and three additional temporary workspaces. As a result of this investigation, 101.0 miles (162.5 km) of preferred and abandoned pipeline corridor, 75 access roads, measuring 49.7 miles (80.0 km) in length, and 47 additional temporary workspaces, totaling 88.7 acres (35.9 ha) in extent, were evaluated. As part of this investigation, 1,625 shovel tests were excavated, six archaeological sites and 12 historic standing structures were identified, and 1,935 artifacts were analyzed.
資料截圖
版權(quán):如無(wú)特殊注明,文章轉(zhuǎn)載自網(wǎng)絡(luò),侵權(quán)請(qǐng)聯(lián)系cnmhg168#163.com刪除!文件均為網(wǎng)友上傳,僅供研究和學(xué)習(xí)使用,務(wù)必24小時(shí)內(nèi)刪除。
熱門推薦
-
加拿大煤炭開采Coal Mining in Canada 2021-09-20
-
年終總結(jié)新年計(jì)劃工作匯報(bào)PPT模板 2021-09-20
