国产aaaa级全身裸体精油片_337p人体粉嫩久久久红粉影视_一区中文字幕在线观看_国产亚洲精品一区二区_欧美裸体男粗大1609_午夜亚洲激情电影av_黄色小说入口_日本精品久久久久中文字幕_少妇思春三a级_亚洲视频自拍偷拍

首頁 > 資料下載 > Preparing for Disruptions Through Early Detection
Preparing for Disruptions Through Early Detection Preparing for Disruptions Through Early Detection

Preparing for Disruptions Through Early Detection

  • 資料類別:
  • 資料大小:
  • 資料編號:
  • 資料狀態(tài):
  • 更新時間:2021-09-09
  • 下載次數(shù):
資料簡介

2008年,位于懷俄明州粉河盆地的黑雷礦山(美國最大的煤礦綜合體,由位于密蘇里州圣路易斯的Arch Arch Inc.擁有)計劃安裝新的大型輸送管,將煤炭轉(zhuǎn)移至裝載火車的筒倉。當(dāng)時BNSF鐵路公司的工程副總裁David Freeman得知該礦山的計劃時,他想確保鐵路投入了。該礦山計劃租用一臺270萬磅的起重機(jī),將260英尺長,500,000磅重的輸送管吊到空中150英尺,并將其放置在塔架上。復(fù)雜的安裝過程將使管道懸掛在3條軌道上,每天有80列BNSF和聯(lián)合太平洋鐵路公司的列車通過,將近100萬噸的煤炭運(yùn)送到整個中西部和東海岸的發(fā)電廠??傮w而言,美國運(yùn)輸?shù)拿禾康娜种粚⒃?60英尺長的管下通過鐵軌。弗里曼的職責(zé)是審查礦山的計劃并確保密切協(xié)調(diào),以最大程度地減少對BNSF客戶的服務(wù)中斷。因此,在計劃于2008年5月的星期六執(zhí)行起重機(jī)的微妙操縱時,BNSF和聯(lián)合太平洋公司停止了交通。弗里曼還派遣了兩名維修人員和四臺大型拖拉機(jī)前往現(xiàn)場,以在需要時提供幫助。他在得克薩斯州沃思堡的BNSF總部擁有一支團(tuán)隊。 BNSF的準(zhǔn)備有所作為。下午12:30那個星期六,弗里曼接到了一個電話。弗里曼回憶說:“他們把管子丟在了軌道上。” 1吊重物的起重機(jī)倒塌了,巨大的管子直接掉落在所有三個軌道上。2事件中三名建筑工人受傷。閱讀全文

IN 2008, the Black Thunder mine in Wyoming’s Powder River Basin — the largest coal mining complex in the United States, owned by St. Louis, Missouri-based Arch Coal Inc. — planned to install a massive new conveyer tube to move coal to a silo for loading trains. When David Freeman, vice president of engineering at BNSF Railway Co. at the time, heard of the mine’s plans, he wanted to be sure the railroad had input. The mine planned to hire a 2.7-million-pound crane to hoist the 260-foot long, 500,000-pound conveyer tube 150 feet into the air and place it on pylons. The intri- cate installation process would suspend the tube over three tracks on which 80 BNSF and Union Pacific Railroad Co. trains traveled every day, carrying almost 1 million tons of coal to fuel power plants all across the Midwest and the East Coast. Overall, one-third of America’s transported coal would pass on the rails under that 260-foot long tube.Freeman’s role was to review the mine’s plans and ensure close coordination to minimize service interruptions to BNSF’s customers. Thus, BNSF and Union Pacific halted traffic while the crane was scheduled to perform its delicate maneuver on a Saturday in May 2008. Freeman also sent two repair crews with four large tractors to the site to assist if needed. And he had a team on notice at BNSF’s headquarters in Fort Worth, Texas. BNSF’s readiness made a difference. At 12:30 p.m. that Sat- urday, Freeman got a phone call. “They dropped the tube on the tracks,” Freeman recalled a stunned onsite worker saying.1 The crane doing the heavy lifting had collapsed, and the giant tube had fallen directly across all three tracks.2 Three construction workers were injured in the incident.Read Full Article

資料截圖
版權(quán):如無特殊注明,文章轉(zhuǎn)載自網(wǎng)絡(luò),侵權(quán)請聯(lián)系cnmhg168#163.com刪除!文件均為網(wǎng)友上傳,僅供研究和學(xué)習(xí)使用,務(wù)必24小時內(nèi)刪除。