国产aaaa级全身裸体精油片_337p人体粉嫩久久久红粉影视_一区中文字幕在线观看_国产亚洲精品一区二区_欧美裸体男粗大1609_午夜亚洲激情电影av_黄色小说入口_日本精品久久久久中文字幕_少妇思春三a级_亚洲视频自拍偷拍

首頁(yè) > 資料下載 > 華盛頓基蒂塔斯縣Ellensburg可再生能源公園Battelle紀(jì)念研究所智能電網(wǎng)項(xiàng)目的最終環(huán)境評(píng)估FINAL ENVIRONMENTAL ASSESSMENT FOR BATTELLE MEMOR
華盛頓基蒂塔斯縣Ellensburg可再生能源公園Battelle紀(jì)念研究所智能電網(wǎng)項(xiàng)目的最終環(huán)境評(píng)估FINAL ENVIRONMENTAL ASSESSMENT FOR BATTELLE MEMOR 華盛頓基蒂塔斯縣Ellensburg可再生能源公園Battelle紀(jì)念研究所智能電網(wǎng)項(xiàng)目的最終環(huán)境評(píng)估FINAL ENVIRONMENTAL ASSESSMENT FOR BATTELLE MEMOR

華盛頓基蒂塔斯縣Ellensburg可再生能源公園Battelle紀(jì)念研究所智能電網(wǎng)項(xiàng)目的最終環(huán)境評(píng)估FINAL ENVIRONMENTAL ASSESSMENT FOR BATTELLE MEMOR

  • 資料類(lèi)別:
  • 資料大?。?/li>
  • 資料編號(hào):
  • 資料狀態(tài):
  • 更新時(shí)間:2021-09-26
  • 下載次數(shù):
資料簡(jiǎn)介

美國(guó)能源部(DOE)提議根據(jù)2009年《美國(guó)復(fù)蘇與再投資法》,以合作協(xié)議的形式向巴特爾紀(jì)念研究所(Battelle Memorial Institute)提供財(cái)政援助贈(zèng)款。這項(xiàng)協(xié)議將有助于擴(kuò)大太陽(yáng)能發(fā)電,并增加可再生能源公園的風(fēng)力發(fā)電能力。能源部提議的行動(dòng)是向巴特爾提供60萬(wàn)美元的財(cái)政援助,以促進(jìn)太陽(yáng)能發(fā)電的擴(kuò)展和在華盛頓州埃倫斯堡市的可再生能源公園增加風(fēng)力發(fā)電能力。該項(xiàng)目的估計(jì)費(fèi)用為120萬(wàn)美元。巴特爾將購(gòu)買(mǎi)并安裝540塊太陽(yáng)能電池板、10個(gè)太陽(yáng)能濃縮模塊和8個(gè)小型風(fēng)力渦輪機(jī),使埃倫斯堡市民能夠使用可再生能源發(fā)電。巴特爾提出的項(xiàng)目將增加85千瓦的太陽(yáng)能和80千瓦的風(fēng)能發(fā)電能力。該項(xiàng)目將建在埃倫斯堡市的可再生能源公園內(nèi),該公園位于90號(hào)州際公路東側(cè)一塊曾被干擾的農(nóng)田上。公園目前正在開(kāi)發(fā)中,包含192塊多晶太陽(yáng)能電池板和180塊薄膜太陽(yáng)能電池板。根據(jù)《國(guó)家環(huán)境政策法案》(42 U.S.C.第4321條等)和美國(guó)能源部的《國(guó)家環(huán)境政策法案實(shí)施條例》(10 CFR第1021部分)和程序,本EA審查了美國(guó)能源部提議的行動(dòng)、巴特爾提議的項(xiàng)目和無(wú)行動(dòng)方案的潛在環(huán)境影響。其目的是向能源部和公眾通報(bào)擬議項(xiàng)目和替代方案的潛在環(huán)境后果。

The U.S. Department of Energy (DOE) proposes to award a financial assistance grant under the American Recovery and Reinvestment Act of 2009 in the form of a cooperative agreement to Battelle Memorial Institute (Battelle). This agreement would facilitate expansion of solar energy generation and add wind capacity at the Renewable Energy Park. DOE’s proposed action is to award a $600,000 financial assistance grant to Battelle to facilitate the expansion of solar generation and the addition of wind capacity at the City of Ellensburg’s Renewable Energy Park located in Ellensburg, Washington. The estimated cost of the project is $1.2 million. Battelle would purchase and install 540 solar panels, 10 solar concentrating modules, and 8 small wind turbines to make renewable energy generation accessible to the citizens of Ellensburg. Battelle’s proposed project would add up to an additional 85 kilowatts of solar energy and 80 kilowatts of wind energy generating capacity. The proposed project would be built within the City of Ellensburg’s Renewable Energy Park, which is on a previously disturbed agricultural field located directly east of Interstate 90. The park is currently undergoing development and contains 192 polycrystalline solar panels and 180 thin-film solar panels. In compliance with the National Environmental Policy Act (42 U.S.C. Section 4321 et seq.) and DOE’s National Environmental Policy Act implementing regulations (10 CFR Part 1021) and procedures, this EA examines the potential environmental impacts of DOE’s proposed action, Battelle’s proposed project, and the No-Action Alternative. Its purpose is to inform DOE and the public of the potential environmental consequences of the proposed project and the alternatives.

資料截圖
版權(quán):如無(wú)特殊注明,文章轉(zhuǎn)載自網(wǎng)絡(luò),侵權(quán)請(qǐng)聯(lián)系cnmhg168#163.com刪除!文件均為網(wǎng)友上傳,僅供研究和學(xué)習(xí)使用,務(wù)必24小時(shí)內(nèi)刪除。