化石能源工廠的成本和性能基線 第1卷:瀝青煤和天然氣發(fā)電Cost and Performance Baseline for Fossil Energy Plants Volume 1: Bitumi
- 資料類別:
- 資料大?。?/li>
- 資料編號:
- 資料狀態(tài):
- 更新時(shí)間:2021-09-09
- 下載次數(shù):次
資料簡介
使用ASPEN Plus∈對本研究中分析的電廠配置進(jìn)行建模。 (Aspen)建模程序。性能和過程限制基于已發(fā)表的報(bào)告, 從技術(shù)供應(yīng)商和用戶獲得的信息、成本和性能數(shù)據(jù) 設(shè)計(jì)/建造公用事業(yè)項(xiàng)目,和/或最佳工程判斷。資本和運(yùn)營成本是 WorleyParsons基于模擬結(jié)果并通過現(xiàn)有組合進(jìn)行估計(jì) 供應(yīng)商報(bào)價(jià),從以前的設(shè)計(jì)/構(gòu)建項(xiàng)目的比例估計(jì),或兩者的組合。 操作和維護(hù)(O&M)成本和運(yùn)輸、存儲和監(jiān)視的成本 (TS&M)二氧化碳(CO2)在碳捕獲的情況下也基于 參考數(shù)據(jù)和比例估計(jì)。為所有工廠確定了電費(fèi)(COE)。 假設(shè)投資者擁有的公用事業(yè)(IOU)融資。這個(gè)分析的初步結(jié)果是 受到業(yè)界專家、學(xué)術(shù)界和政府研究的重大同行評議 以及管理機(jī)構(gòu)。根據(jù)這些專家的反饋,報(bào)告同時(shí)進(jìn)行了更新 在技術(shù)內(nèi)容和修訂成本方面。
The power plant configurations analyzed in this study were modeled using the ASPEN Plus? (Aspen) modeling program. Performance and process limits were based upon published reports, information obtained from vendors and users of the technology, cost and performance data from design/build utility projects, and/or best engineering judgment. Capital and operating costs were estimated by WorleyParsons based on simulation results and through a combination of existing vendor quotes, scaled estimates from previous design/build projects, or a combination of the two. Operation and maintenance (O&M) costs and the cost for transporting, storing, and monitoring (TS&M) carbon dioxide (CO2) in the cases with carbon capture were also estimated based on reference data and scaled estimates. The cost of electricity (COE) was determined for all plants assuming investor-owned utility (IOU) financing. The initial results of this analysis were subjected to a significant peer review by industry experts, academia and government research and regulatory agencies. Based on the feedback from these experts, the report was updated both in terms of technical content and revised costs.
資料截圖
版權(quán):如無特殊注明,文章轉(zhuǎn)載自網(wǎng)絡(luò),侵權(quán)請聯(lián)系cnmhg168#163.com刪除!文件均為網(wǎng)友上傳,僅供研究和學(xué)習(xí)使用,務(wù)必24小時(shí)內(nèi)刪除。
熱門推薦
-
加拿大煤炭開采Coal Mining in Canada 2021-09-09
-
化工節(jié)能技術(shù)手冊 王文堂 2006年化學(xué)工業(yè)出版社 2021-09-09
-
年終總結(jié)新年計(jì)劃工作匯報(bào)PPT模板 2021-09-09
