Development and Prospect of Installation Technology of Electrical and Mechanical Equipment in Hydrop
- 期刊名字:電氣(英文版)
- 文件大?。?/li>
- 論文作者:Fu Yuanchu
- 作者單位:China
- 更新時(shí)間:2023-02-08
- 下載次數(shù):次
The hydropower installed capacity in China exceeded 100 GW by the end of 2004. With the develop-ment of hydropower construction cause, the contingents of electrical and mechanical installation also grew steadily.The installation and debugging techniques made great strides in aspects of different conventional hydrogeneratorsets, reversible pumped-storage units and their rotor spiders, runners, bearings, penstocks as well as controlequipment, such as computerized governors, intelligent monitoring devices. Major technical innovations werebrought about in the electrical and mechanical installation. For an arduous task to construct hydropower projectsof over 50 GW confronts hydropower installation enterprises at the beginning of 21 st century, the installationtechnologies will certainly develop around the projects.
-
C4烯烴制丙烯催化劑 2023-02-08
-
煤基聚乙醇酸技術(shù)進(jìn)展 2023-02-08
-
生物質(zhì)能的應(yīng)用工程 2023-02-08
-
我國(guó)甲醇工業(yè)現(xiàn)狀 2023-02-08
-
石油化工設(shè)備腐蝕與防護(hù)參考書十本免費(fèi)下載,絕版珍藏 2023-02-08
-
四噴嘴水煤漿氣化爐工業(yè)應(yīng)用情況簡(jiǎn)介 2023-02-08
-
Lurgi和ICI低壓甲醇合成工藝比較 2023-02-08
-
甲醇制芳烴研究進(jìn)展 2023-02-08
-
精甲醇及MTO級(jí)甲醇精餾工藝技術(shù)進(jìn)展 2023-02-08
